SREE lines running outside China
Export projects are where a machine builder is really tested: different steel, different voltages, different service distance. These clips were filmed in customer plants in Central Asia, where our lines have been running in daily production.
Filmed on site
Customer plants, not showrooms. Ask us for the reference contact of the project closest to your own product mix.
What export delivery includes
Export packing and documentation, voltage and frequency adapted to your grid, installation and commissioning on site, operator training, a spare and wear part list with the machine, and remote diagnostics with program updates afterwards.
Field notes from recent installations
Factory test in Rugao in November 2025, shipped in two 40-foot containers, installed and handed over to the operators in May 2026.
Foundation correction, local oils and grout for a cold climate, and on-site acceptance in May 2026.
Registration, travel and erection of a slitting line at a transformer core plant, September 2026.
Planning a line outside China?
Tell us your country, grid supply and lamination sizes. We will send the reference build closest to your project and the delivery scope that goes with it.